The Restoration Checklist


1984 Porsche 944 | One Project at a Time

When I purchased my 1984 Porsche 944 in November 2024, I knew it needed some attention. After sitting for approximately five years, there were plenty of things that needed repairing, replacing, or simply bringing back to life.

What I didn't fully appreciate was just how many individual projects would eventually become part of the restoration.

Some were relatively straightforward weekend jobs. Others required special tools, plenty of research, a little help from experienced Porsche mechanics, and occasionally more patience than I expected.

This page is a running record of the work completed, the projects underway, and what's still ahead.

The goal has never been to build a show car. It's to bring this 944 back to a condition I can be proud of, while preserving as much of its original character as possible.

Body, Exterior & Weatherproofing

  • Replaced the rear hatch seal with an OEM replacement.

  • Replaced deteriorated door weatherstripping.

  • Replaced sunroof seals.

  • Replaced window seals to address water intrusion.

  • Removed and reinstalled the rear quarter windows.

  • Replaced the missing front side marker light after the Tail of the Dragon adventure.

  • Identified the original factory paint color, M3V deep burgundy.

  • Investigated water intrusion and corrosion around the battery tray.

  • Repair rust damage around the battery-box drain opening.

  • Repair corrosion in the passenger-side inner fender.

  • Complete rear quarter-window trim installation.

  • Replace the windshield.

  • Replace the front bumper valance.

  • Reattach the original dealer-installed front valance lip.

Interior, Trim & Electrical

  • Replaced the interior headliner.

  • Replaced the front interior ceiling trim panels.

  • Replaced the rear interior ceiling trim panels.

  • Replaced the original sun visors with the sturdier later-style 1985.5 Porsche 944 visors.

  • Replaced the driver's door panel with a replacement sourced from 944 Barn.

  • Replaced the passenger-side door panel.

  • Upgraded the headlights to LED units.

  • Resolved fitment issues with the new LED headlight assemblies.

  • Purchased and installed a retro-style Blaupunkt radio with Bluetooth and hands-free calling.

  • Sourced a replacement dashboard through 944Parts.

  • Install the replacement dashboard.

  • Finalize phone mounting location for navigation and calls.

  • Install USB-C charging ports, potentially integrated into a blank switch plate.

  • Complete final electrical and accessory checks.

Sunroof — Mechanical Restoration

  • Replaced deteriorated sunroof seals.

  • Repaired and replaced damaged sunroof gears.

  • Repaired and adjusted the sunroof operating mechanism.

  • Restored proper sunroof operation.

  • Replaced the sunroof latch mechanisms.

Braking System

  • Replaced all four brake rotors.

  • Replaced front and rear brake pads.

  • Cleaned and refinished the brake calipers in satin black.

  • Addressed the rear driver's-side caliper mounting bolt issue.

  • Cleaned and refinished front brake backing plates.

  • Complete final brake inspection and road-test verification after reassembly.

Steering System

  • Replaced the firewall steering shaft.

  • Replaced the steering shaft connecting to the rack.

  • Disassembled the ZF power steering rack.

  • Cleaned, resealed, and rebuilt the power steering rack.

  • Disassembled and rebuilt the ZF power steering pump.

  • Replaced the pump's internal seals and shaft seal.

  • Sourced a donor pump to replace a damaged housing section.

  • Reassembled the pump using replacement components and new seals.

  • Attached the rebuilt steering rack to the front crossmember.

  • Reinstalled the rebuilt power steering pump.

  • Reinstalled the steering rack as part of the combined engine and front suspension assembly.

  • Verify all steering shaft connections and mounting hardware.

  • Complete remaining power steering hose connections.

  • Fill and bleed the power steering system.

  • Inspect the rebuilt rack and pump for leaks.

  • Verify steering operation during road testing.

Front Suspension

  • Removed the front strut assemblies.

  • Disassembled the front struts and springs.

  • Removed rust from suspension components using Evapo-Rust.

  • Cleaned and refinished the front steering knuckles.

  • Cleaned and painted the strut housings satin black.

  • Cleaned and refinished the front suspension components.

  • Had the original front coil springs professionally powder-coated by Custom Coaters Atlanta in RAL 1023 Traffic Yellow, similar to Koni yellow.

  • Built custom wooden supports to assist with strut and brake assembly.

  • Purchased specialty tools for suspension disassembly and restoration.

  • Reassembled both front strut assemblies.

  • Reinstalled the original refinished coil springs.

  • Reassembled the steering knuckles and lower control arms.

  • Installed the restored front suspension as part of the combined engine installation.

  • Touch up any remaining minor chips in the powder-coated springs.

  • Complete final suspension hardware inspection and torque verification.

  • Complete front wheel alignment.

Rear Suspension

  • Inspect rear trailing arm bushings.

  • Determine replacement requirements for rear suspension bushings.

  • Inspect rear shock absorbers.

  • Inspect rear sway bar and associated bushings, if equipped.

  • Confirm original suspension option configuration.

  • Determine whether additional rear suspension refurbishment is necessary.

Engine — Diagnosis & Disassembly

  • Performed initial engine compression testing.

  • Identified low compression in cylinder #4, approximately 40 PSI compared with more than 160 PSI in the other cylinders.

  • Removed the engine from underneath the car on October 9, 2026.

  • Disassembled the original engine for inspection.

  • Inspected cylinder #4 using a borescope.

  • Identified head gasket deterioration and coolant contamination.

  • Discovered significant sludge accumulation in the oil pan.

  • Identified a previously repaired crack in the original engine block.

  • Determined that the original engine block was unsuitable for rebuilding.

  • Evaluated multiple potential replacement engines and blocks.

  • Rejected the first replacement engine after inspection.

  • Rejected the second replacement block due to cylinder-wall pitting.

  • Located a suitable replacement engine block from Don's stored engine.

  • Identified the replacement block as an early-1982 version.

  • Investigated component compatibility differences between the early replacement block and the original 1984 engine.

Engine — Machine Shop & Component Preparation

  • Sent the replacement engine block to the machine shop.

  • Sent the original cylinder head to the machine shop.

  • Sent the cam tower to the machine shop.

  • Completed professional cleaning and required machining of the major engine components.

  • Removed and cleaned the engine oil pan.

  • Completed additional cleaning and polishing of the oil pan.

  • Removed the bellhousing for more thorough cleaning.

  • Cleaned the accessible exterior surfaces of the bellhousing.

  • Personally cleaned the remaining engine components by hand.

  • Established a final inspection and cleaning process with Don, who checks and recleans components as necessary.

  • Identified and sourced replacement engine hardware, seals, gaskets, and associated components needed for reassembly.

Engine — Rebuilding & Reassembly

  • Began engine rebuilding and reassembly under Don Cross's direction.

  • Reassembled the replacement engine block and internal engine components.

  • Reinstalled the cylinder head.

  • Reinstalled the cam tower.

  • Reinstalled the cleaned and polished oil pan.

  • Reinstalled the intake manifold and associated components.

  • Installed timing and balance-shaft components and front timing covers.

  • Reinstalled the alternator and associated mounting brackets.

  • Reinstalled the air conditioning compressor and associated brackets.

  • Reinstalled the rebuilt power steering pump.

  • Installed the refinished exhaust headers.

  • Positioned engine wiring and associated components for reinstallation.

  • Completed the major engine assembly work in preparation for installation.

  • Complete remaining engine connections and final assembly checks.

  • Verify final engine timing and associated settings before startup.

Air-Oil Separator — Early Engine Compatibility

  • Discovered compatibility differences between early and later Porsche air-oil separators.

  • Identified dimensional differences between the original 1984 separator and the early replacement engine block.

  • Researched the correct early-style Porsche air-oil separator.

  • Identified the correct early part number, 944 107 180 06.

  • Consulted Elliott Grafton and Mark Plieman regarding sourcing options.

  • Expanded the parts search to European Porsche suppliers.

  • Connected with Bernd at Autoteile Degler in Germany.

  • Located a used original early-style air-oil separator for €30.

  • Confirmed shipment from Germany via DHL on November 17.

  • Receive the replacement air-oil separator.

  • Inspect and clean the replacement separator.

  • Install the correct separator and associated seals.

  • Verify proper sealing and crankcase ventilation operation.

Clutch & Flywheel

  • Replaced the clutch master cylinder during the earlier restoration work.

  • Removed the original clutch assembly during engine disassembly.

  • Sent the original flywheel to the machine shop.

  • Professionally resurfaced the main flywheel friction surface.

  • Resurfaced the outer pressure-plate mounting surface to maintain the precise factory-specified dimensional relationship between the two surfaces.

  • Purchased an all-new clutch assembly.

  • Reinstalled the professionally resurfaced original flywheel.

  • Installed the new clutch assembly.

  • Reinstalled the engine with the new clutch assembly in place.

  • Verify clutch hydraulic system operation.

  • Verify clutch engagement and disengagement.

  • Confirm proper clutch operation during initial road testing.

Exhaust System

  • Sourced replacement exhaust sections through Elliott at 944Barn.

  • Purchased later-style stainless steel tubular exhaust headers.

  • Identified damage to the existing ceramic coating.

  • Refinished the headers using VHT FlameProof primer and flat aluminum paint.

  • Completed the first two stages of the header coating's heat-curing process.

  • Installed the refinished tubular exhaust headers on the rebuilt engine.

  • Preserved the original cast-iron exhaust manifolds for possible future refurbishment.

  • Complete remaining exhaust system connections.

  • Complete the final header coating cure through the required heat cycles.

  • Inspect the exhaust system for leaks and proper clearance.

Engine Bay & Underhood Restoration

  • Removed engine components to gain access for cleaning and restoration.

  • Cleaned accumulated grime from the engine compartment.

  • Identified areas of rust and deteriorated paint.

  • Cleaned and prepared various engine mounting and suspension components.

  • Located original 1984 Porsche sheet metal for corrosion repairs.

  • Applied corrosion protection using Eastwood Red Oxide Rust Encapsulator Plus.

  • Completed substantial engine-bay surface preparation and rust treatment.

  • Repainted the engine compartment in the car's original M3V deep burgundy.

  • Applied the engine-bay clear coat.

  • Installed DEI Floor & Tunnel Shield II insulation on the firewall.

  • Installed thermal acoustic insulation around the bellhousing area.

  • Used DEI heat-resistant tape to finish portions of the firewall insulation.

  • Purchased additional heat-shielding material for evaluation near the exhaust manifold.

  • Identified and began sourcing replacement engine-bay nuts, bolts, washers, and brackets.

  • Reinstalled the rebuilt engine into the refinished engine compartment.

  • Complete any remaining localized rust repairs and paint touch-ups.

  • Secure remaining firewall insulation edges as required.

  • Determine whether additional exhaust-area heat shielding is necessary.

  • Complete remaining engine-bay hardware replacement.

  • Replace hood insulation and retaining clips.

  • Complete final engine-bay detailing.

Engine & Front Suspension Installation

  • Developed an installation approach to combine the engine, front crossmember, steering rack, and suspension components into a single assembly.

  • Attached the rebuilt ZF power steering rack to the front crossmember.

  • Attached the left and right lower control arms.

  • Assembled the left and right front strut assemblies.

  • Combined the rebuilt engine and restored front suspension outside the car.

  • Positioned the complete assembly beneath the car on a hydraulic lifting table on November 17.

  • Raised and installed the rebuilt engine and front suspension assembly into the 944 on November 18.

  • Documented the installation with photographs.

  • Complete remaining drivetrain connections and inspections.

  • Verify engine and crossmember mounting hardware.

  • Verify all suspension and steering mounting hardware.

  • Complete remaining wiring, hoses, cables, and ground connections.

  • Complete final installation inspection.

Fuel System

  • Purchased the Rennbay Early Type 2 fuel line repair kit from 944Online in November 2025.

  • Replaced the aging engine-bay fuel supply and return hoses using the Rennbay kit.

  • Installed new compression fittings connecting the replacement hoses to the original metal fuel lines.

  • Purchased four replacement fuel line supports from 944Online in January 2026.

  • Removed the fuel injectors for refurbishment.

  • Had the fuel injectors professionally refurbished by Rick Heidtman at Exfil Performance.

  • Identified the need to clean the fuel tank and refresh the fuel delivery system before starting the rebuilt engine.

  • Confirmed with Bill that the remaining fuel system work is scheduled for November 19.

  • Drain and properly dispose of the old gasoline.

  • Clean and inspect the fuel tank.

  • Replace the fuel tank filter/strainer.

  • Replace the inline fuel filter.

  • Replace the fuel hoses requiring renewal.

  • Inspect the fuel pump and associated connections.

  • Inspect and flush fuel lines as necessary.

  • Add fresh gasoline.

  • Prime the fuel system.

  • Verify fuel pressure and check for leaks before initial startup.

Cooling System

  • Inspect the radiator and associated mounting hardware.

  • Inspect coolant hoses and replace deteriorated hoses as required.

  • Complete coolant pipe and hose connections.

  • Verify cooling fan installation and electrical connections.

  • Fill the cooling system with fresh coolant.

  • Bleed the cooling system.

  • Verify cooling fan operation.

  • Check cooling system operation, temperature, and leaks during the initial engine heat cycles.

Air Conditioning System

  • Identified a previous modification to the A/C rubber hose made during the R134a conversion.

  • Obtained a replacement A/C line to eliminate the unwanted access fitting in the original hose.

  • Confirmed that Bill has a six-point A/C hose crimping tool.

  • Reinstalled the air conditioning compressor on the rebuilt engine.

  • Complete the replacement A/C hose fitting and crimp.

  • Complete remaining A/C line connections.

  • Pressure-test the repaired A/C system.

  • Evacuate and recharge the system with the appropriate refrigerant and oil.

  • Verify proper air conditioning operation.

Wheels & Tires

  • Removed the old, approximately ten-year-old tires.

  • Purchased and installed Michelin Porsche-specification summer tires.

  • Inspected the wheels and tires as part of returning the car to driving condition.

  • Complete final wheel installation.

  • Verify wheel bearing condition and adjustment.

  • Verify wheel fastener torque.

  • Verify tire pressures.

  • Complete wheel alignment following suspension installation.

Initial Engine Startup & Break-In

Target date: November 20, 2026 — the second anniversary of purchasing the car.

  • Complete outstanding fuel system work.

  • Confirm installation of all required engine components, including the air-oil separator.

  • Complete remaining mechanical and electrical connections.

  • Fill the engine with the appropriate oil.

  • Verify all fluid levels.

  • Prime the engine lubrication system and establish oil pressure.

  • Verify fuel pressure and check for fuel leaks.

  • Complete pre-start inspection with Don.

  • Perform the first engine startup.

  • Record a video of the first startup.

  • Monitor engine oil pressure and coolant temperature.

  • Inspect for oil, coolant, fuel, exhaust, and power steering leaks.

  • Complete initial engine heat cycles.

  • Perform post-startup inspection and adjustments.

  • Follow Don's recommended engine break-in procedure.

  • Complete the initial post-rebuild oil and filter change at the recommended interval.

Returning to the Road

  • Complete final mechanical and safety inspection.

  • Verify braking, steering, and clutch operation.

  • Complete wheel alignment.

  • Perform initial controlled road test.

  • Inspect the car following the first road test.

  • Address any issues identified during initial driving.

  • Complete the recommended engine break-in mileage.

  • Gradually return the 944 to normal driving.

  • Plan another trip to the North Georgia mountains.

  • Getting Mala in the Driver's Seat.

Research, Parts & The Restoration Journey

  • Located and purchased the car in Gilbert, South Carolina, on November 20, 2024.

  • Transported the 944 home on a trailer.

  • Obtained the Georgia title following resolution of the previous title issue.

  • Established relationships with Bill Briers and Don Cross at German Automotive.

  • Connected with Elliott Grafton at 944Barn for advice and replacement parts.

  • Established relationships with additional Porsche specialists and parts suppliers.

  • Expanded the search for hard-to-find original Porsche components to European suppliers.

  • Sourced used original Porsche components to preserve factory fitment.

  • Established a restoration expense ledger.

  • Obtained an extensive collection of Porsche technical documentation from Rick Heidtman.

  • Uploaded the Porsche factory workshop manuals, parts catalogs, wiring diagrams, and reference material into ChatGPT to create a searchable technical research library.

  • Began documenting the restoration through photographs and written stories.

  • Established the restoration website at charapich.com.

  • Developed the Parts & Suppliers resource page.

  • Developed the Services & Specialists resource page.

  • Developed the Tools & Restoration Products resource page.

  • Developed the Technical Resources page.

  • Developed the AI Diligence Statement.

  • Documented engine removal, disassembly, diagnosis, and replacement block research.

  • Documented the engine rebuild and installation.

  • Publish remaining website updates.

  • Locate and incorporate the previously created line-art illustration of the 944.

  • Continue updating the restoration expense ledger with confirmed purchases, shipping, and taxes.

  • Document the first engine startup.

  • Document the first successful drive following the engine rebuild.

The Work Continues

Looking back at this list, it's remarkable how many individual projects have gone into bringing this car back to life.

On October 9, 2026, we removed the engine to investigate what initially appeared to be a compression problem in one cylinder.

Forty days and a few sleepless nights later, on November 18, the rebuilt engine, refurbished power steering rack, and restored front suspension were finally back in the car.

Between a cracked engine block, two rejected donor blocks, and a search for an obscure Porsche component that eventually took me to Germany, it's been quite an adventure.

While Don has been rebuilding the engine, I've spent countless hours cleaning, removing rust, painting, polishing, and preparing the components that would eventually go back into the car.

Seeing it all come together has made those hours worthwhile.

There's still work to do before we turn the key, and plenty of smaller projects will remain even after the car is back on the road.

But that's part of the experience.

One project at a time.